Commercial Permits

The fees do not include the State Mandated fees. All permits will require an additional $4.00 State Fee and $0.50 City of Yukon collection Fee.

Available Permits

Building

Minimum Permit Fee (new/remodel)

$50.00 or $0.12 per sq. ft., whichever is greater

Plan Review

$75.00

Certificate of Occupancy

$50.00

Temporary Certificate of Occupancy

$50.00

Curb Cut

$150.00

Razing of a Building

$50.00

Moving of a Building

$150.00

Carport

$150.00

Accessory Building

$50.00 or $0.10 per sq. ft., whichever is greater

Swimming Pool

$200.00

Fence

$40.00

Re-Roof

$112.50

Storm Shelter

$45.00

Land Disturbance (more than an acre)

$70.00

Right-of-Way (boring)

$50.00 appl. fee

Agricultural Use Buildings

$0.03 per sq. ft.

Plumbing

NEW / REMODEL

Minimum Permit Fee

$35.00 or $0.03 per sq. ft.

CONNECTIONS (per dwelling unit, lease space, or use)

Sewer Tap

$50.00

Water Tap

$75.00

Connection Fee

$100.00

Sprinkler System

$25.00

 

SPECIAL FIXTURES

Commercial Dishwasher

$10.00, each

Industrial Waste Pre-treatment Interceptor (including traps & vents)

$30.00, each

Commercial Garbage Disposal

$10.00

Water Heater

$35.00

BACK FLOW PREVENTION DEVICES

First

$35.00; $25.00 for each thereafter

Backwater Valve

$25.00

Grease Trap

$30.00

 

 

 

ALTERATION / REPLACEMENT

 

 

Water Service

$35.00

Sewer

$35.00

Water Heater

$35.00

FUEL / GAS

 

Gas Extension, with test

$35.00

Gas Pressure - test only

$35.00

Gas Vent Replacement

$35.00

Mechanical

NEW / REMODEL

Minimum Permit Fee

$35.00

1/8 HP Motors to 4 HP or Tons

$10.00

5 HP or Tons to 25 HP or Tons

$20.00

26 HP or Tons to 60 HP or Tons

$35.00

61 HP or Tons to 100 HP or Tons

$75.00

Over 100 HP or Tons

$150.00

Kitchen Exhaust System

$50.00, each

Forced Air Heater (split system)

$35.00

Air Conditioner (split system)

$35.00

Heat & Air Combination

$35.00

BOILERS (each)

Minimum Permit Fee

$50.00

Up to 30 HP

$50.00

31 to 150 HP

$70.00

151 to 300 HP

$150.00

Over 300 HP

$200.00

 

ALTERATION / REPLACEMENT / REMODEL (each)

Forced Air Heater

$35.00

Air Conditioner

$35.00

Coil & Duct only

$35.00

Kitchen Exhaust System

$50.00

Electrical

Minimum Permit Fee

$50.00 or $0.03 per sq. ft.

Cut-over Inspection

$35.00

Service Pole

$35.00

Swimming Pool Bonding (new)

$35.00

 

SERVICE / REPAIR / REPLACEMENT / ALTERATION

Service up to 200 Amps

$35.00
+ $25.00, per additional 100 amp or portion thereof 

Service up to 400 Amps

$35.00
+ $25.00, per additional 100 amp or portion thereof 

Water Meters and Wells

1" Water Meter

$850.00

2" Water Meter

$1,400.00

3" Water Meter

Actual Cost Plus 10%

4" Water Meter

Actual Cost Plus 10%

   

Water Well Drilling

$75.00

Re-Inspection / After Hours Inspections
All Re-Inspection Fees
(mechanical, electrical, plumbing, building)
$30.00 for first two (2) inspections and $60.00 for each inspection thereafter
After Hours Inspection $200.00 minimum for first two (2) hours; $75.00 for each hour thereafter